Upside Down House, Poland
See the full Unusual building of the week list here.
Located in the Centre of Education and Regional Promotion in the north Poland town of Szymbark, the Upside Down House is a popular tourist attraction.
Completed in 2007, the house was designed by businessman Daniel Czapiewski as a statement about the uncertainty of life in post-Communist era Poland.
The construction of the timber-clad house proved rather problematic. The foundations alone required 200 m3 of concrete. Danmar, a timber construction company, took 114 days to construct the house, rather than the normal time of just three weeks, in part due to the regular breaks workers had to take because of the disorientation caused by the strange angles of the walls.
Indeed, visitors to the house often report feelings of giddiness and nausea only a few minutes after they have entered through one of the attic windows and walked along the ceiling.
The interior of the house is furnished in a style typical of houses in the Communist-era Poland of the 1970s. There is even an old TV that shows vintage propaganda.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.